Ardingly Railway Station

About Ardingly Railway Station

Ardingly was a railway station which served the West Sussex village of Ardingly in England. It was opened on 3 September 1883 by the London, Brighton and South Coast Railway (LBSCR) closed eighty years later and is currently used as an aggregates depot. The Bluebell Railway owns the trackbed from just east of the station to Horsted Keynes and has long term plans to rebuild the line. HistoryOpening and routeThe LBSCR opened a 4½-mile link line between Horsted Keynes on its Lewes to East Grinstead Line and Haywards Heath on the Brighton Main Line. Doubled throughout, the line curved away from Horsted Keynes over Sheriff Mill Viaduct (117 yards and named after the nearby Lower Sheriff Farm), climbing on a gradient to reach Lywood Tunnel (218 yards) before continuing on the level for nearly 2 miles to reach the line's only intermediate station at Ardingly. From Ardingly, the line continued for a further mile to reach Copyhold Junction on the Brighton Line, just south of the Ouse Valley Viaduct. At first there was no signal box at the junction, with services running on an independent line parallel to the Brighton Main Line as far as the north-facing bay platform at Haywards Heath. A box was installed in 1912 which remained in use until 1932 when Haywards Heath was rebuilt with up and down loop platforms, and a new box brought into service there.

Ardingly Railway Station Description

Ardingly was a railway station which served the West Sussex village of Ardingly in England. It was opened on 3 September 1883 by the London, Brighton and South Coast Railway (LBSCR) closed eighty years later and is currently used as an aggregates depot. The Bluebell Railway owns the trackbed from just east of the station to Horsted Keynes and has long term plans to rebuild the line. HistoryOpening and routeThe LBSCR opened a 4½-mile link line between Horsted Keynes on its Lewes to East Grinstead Line and Haywards Heath on the Brighton Main Line. Doubled throughout, the line curved away from Horsted Keynes over Sheriff Mill Viaduct (117 yards and named after the nearby Lower Sheriff Farm), climbing on a gradient to reach Lywood Tunnel (218 yards) before continuing on the level for nearly 2 miles to reach the line's only intermediate station at Ardingly. From Ardingly, the line continued for a further mile to reach Copyhold Junction on the Brighton Line, just south of the Ouse Valley Viaduct. At first there was no signal box at the junction, with services running on an independent line parallel to the Brighton Main Line as far as the north-facing bay platform at Haywards Heath. A box was installed in 1912 which remained in use until 1932 when Haywards Heath was rebuilt with up and down loop platforms, and a new box brought into service there.

More about Ardingly Railway Station

Ardingly Railway Station is located at Haywards Heath
http://en.wikipedia.org/wiki/index.html?curid=5973012