Dutton Horse Bridge

About Dutton Horse Bridge

Dutton Horse Bridge is a timber twin-span footbridge across part of the Weaver navigation, near the villages of Acton Bridge and Dutton in Cheshire, England. The bridge is located at, between the Dutton Locks and Dutton Viaduct. It carries the towpath across a subsidiary channel used to regulate the water level, at the point where it rejoins the main river. The bridge dates from 1915–1919 and is by John Arthur Saner. It is recorded in the National Heritage List for England as a designated Grade II listed building; the listing describes it as "an elegant structure in the functional waterways tradition". The bridge is one of the earliest remaining examples of a laminated timber structure, and is also believed to be the sole laminated greenheart timber bridge in the country. HistoryJ. A. Saner, the bridge's designer, was chief engineer to the Weaver Navigation Trust from 1888 to 1934. He was responsible for many other innovative structures on the Weaver, including Northwich's Hayhurst Bridge and Town Bridge of 1899, believed to be the two earliest electrically operated swing bridges in Britain, as well as the electrification of the Anderton Boat Lift. Work on Dutton Horse Bridge commenced in 1915 (engineering drawings from that date were archived by British Waterways), and was completed in June 1919. The bridge was renovated in the 1990s, when some of the submerged greenheart timber was found to be still intact.

Dutton Horse Bridge Description

Dutton Horse Bridge is a timber twin-span footbridge across part of the Weaver navigation, near the villages of Acton Bridge and Dutton in Cheshire, England. The bridge is located at, between the Dutton Locks and Dutton Viaduct. It carries the towpath across a subsidiary channel used to regulate the water level, at the point where it rejoins the main river. The bridge dates from 1915–1919 and is by John Arthur Saner. It is recorded in the National Heritage List for England as a designated Grade II listed building; the listing describes it as "an elegant structure in the functional waterways tradition". The bridge is one of the earliest remaining examples of a laminated timber structure, and is also believed to be the sole laminated greenheart timber bridge in the country. HistoryJ. A. Saner, the bridge's designer, was chief engineer to the Weaver Navigation Trust from 1888 to 1934. He was responsible for many other innovative structures on the Weaver, including Northwich's Hayhurst Bridge and Town Bridge of 1899, believed to be the two earliest electrically operated swing bridges in Britain, as well as the electrification of the Anderton Boat Lift. Work on Dutton Horse Bridge commenced in 1915 (engineering drawings from that date were archived by British Waterways), and was completed in June 1919. The bridge was renovated in the 1990s, when some of the submerged greenheart timber was found to be still intact.

More about Dutton Horse Bridge

Dutton Horse Bridge is located at Northwich
http://en.wikipedia.org/wiki/Dutton_Horse_Bridge