About Forster Plumbing Services
Plumbing
Reviews
New drain, soil stack and wastes fitted to exciting bathroom. Amazing what bad workmanship you have to go around and correct!
Old radiator had fallen off the wall, patched up painted and replaced with nice new radiator 👌
Bathroom Job at Morpeth complete. Fully tiled underfloor heating, large ladder towel radiator. Grey gloss wash basin unit. L Shape bath with new over head rain water shower head. Matt White ceiling cladding with 6 Down lights fitted to brighten up the room. Very happy with the results.
Old leaking soil stack replaced today. And 3 old radiators replaced with bigger radiators in ashington
Toilet replacement fitted today with cladding on the back wall. And new kitchen tap fitted as old one was leaking from handles. Rest of cladding to be finished. And new flooring to go down.
Bit work from today. Replaced old white shower enclosure with chrome sliding door enclosure. Replaced thermostatic radiator valves. Fitted new pop-up wastes to 3 wash basins. Found and Fixed leak from existing low level shower waste.
Old plastic riser shower tray replaced with low level stone tray
Old to new
En-suite completed in ashington. Fitted units with Quartz mirror chip tops. Ladder towel radiator. Low level shower tray and frameless shower enclosure. With shower board. Overhead rainfall shower. Floor to ceiling tiles.... White ceiling cladding with chrome spot lights and extractor fitted. LED mirrored cabinet with shaving point inside.
See More
Nice double panel upright radiator fitted in pegswood today. Leaving plenty room for a table on the kitchen
Work carried out so far on a en-suite in ashington this week. Low level tray, fitted wash unit and toilet unit. Quartz mirror chip worktops fitted today ready for tiling.
Full bathroom suites, new radiators to heating systems power flush. Get in touch for prices.
Power Flush Results from Magnaclean filter
Another Power Flush complete on heating system in Gosforth, with great results. Radiators had cold spots in the middle. Most were only heating around the outside. Now they are giving out the heat they should. Also replaced passing shower valve.
Power flush done today. All radiators now heating as they should
Another bathroom complete. Tiled floor to ceiling, large vanity units. New low level shower tray and new shower, towel rail.
Old and new