Hampton Court Bridge

About Hampton Court Bridge

Hampton Court Bridge crosses the River Thames in England approximately north–south between Hampton, London and East Molesey, Surrey. It is the upper of two road bridges on the reach above Teddington Lock and downstream of Molesey Lock. The bridge is the most upstream crossing of all of the Thames bridges of Greater London; uniquely one bank is within the county. Historic crossingsFerryThe location of the bridge had been a ferry crossing point since at least the Tudor period. First bridgeIn 1750, James Clarke obtain a private parliamentary bill to construct a privately owned bridge at Hampton Court. The first bridge was built from 1752 until 1753 and opened on 13 December that year. It had seven wooden arches and was built in the Chinoiserie design of the Willow pattern that was popular at the time, attested by two prints made in the year of its opening and the year after. Second bridgeThis bridge was replaced by a more sturdy eleven-arch wooden bridge in 1778. By 1840 this bridge had become dilapidated and the owner appealed to the Corporation of London to support reconstruction. Among their arguments were that since the bridge was built, the City had created Molesey Lock and Weir and as a consequence navigation through the bridge was dangerous. The bridge was described at about this time as "crazy, hog-backed, inconvenient and obstructive of the navigation".

Hampton Court Bridge Description

Hampton Court Bridge crosses the River Thames in England approximately north–south between Hampton, London and East Molesey, Surrey. It is the upper of two road bridges on the reach above Teddington Lock and downstream of Molesey Lock. The bridge is the most upstream crossing of all of the Thames bridges of Greater London; uniquely one bank is within the county. Historic crossingsFerryThe location of the bridge had been a ferry crossing point since at least the Tudor period. First bridgeIn 1750, James Clarke obtain a private parliamentary bill to construct a privately owned bridge at Hampton Court. The first bridge was built from 1752 until 1753 and opened on 13 December that year. It had seven wooden arches and was built in the Chinoiserie design of the Willow pattern that was popular at the time, attested by two prints made in the year of its opening and the year after. Second bridgeThis bridge was replaced by a more sturdy eleven-arch wooden bridge in 1778. By 1840 this bridge had become dilapidated and the owner appealed to the Corporation of London to support reconstruction. Among their arguments were that since the bridge was built, the City had created Molesey Lock and Weir and as a consequence navigation through the bridge was dangerous. The bridge was described at about this time as "crazy, hog-backed, inconvenient and obstructive of the navigation".

More about Hampton Court Bridge

Hampton Court Bridge is located at KT8 9 London, United Kingdom
http://www.hrp.org.uk/hampton-court-palace/