Hickletonno.3Shaft
About Hickletonno.3Shaft
Name | : | HICKLETONNO. 3SHAFT | |
---|---|---|---|
Ref No | : | LK /14-3 | |
Source | : | DECC | |
Disused | : | Yes | |
Man Made | : | Petroleum Well | A hole bored in the earth, designed to bring petroleum oil or gas to the surface |
Hickletonno.3Shaft Description
Name | : | HICKLETONNO. 3SHAFT | |
---|---|---|---|
Ref No | : | LK /14-3 | |
Source | : | DECC | |
Disused | : | Yes | |
Man Made | : | Petroleum Well | A hole bored in the earth, designed to bring petroleum oil or gas to the surface |
More about Hickletonno.3Shaft
Hickletonno.3Shaft is located at Doncaster
Similar Listings
Beaver Tool Hire
4.5