Ivor King Piling

Monday: 08:30 - 17:00
Tuesday: 08:30 - 17:00
Wednesday: 08:30 - 17:00
Thursday: 08:30 - 17:00
Friday: 08:30 - 17:00
Saturday: -
Sunday: -

About Ivor King Piling

At Ivor King we believe piling's not just about plant, but the people that make it happen. Whatever your piling project, we're your people.

Ivor King Piling Description

We’re grounded.
We’re constructive.
We’re family.

Piling’s not so much about plant, although we have plenty of it and it’s the best there is, it’s about the people that make it happen.

You’ll find we’re straightforward to work with, experienced in delivering the right solutions and understand the value of working together to get the job done.

Whatever your piling project, we’re your people.

Reviews

User

RECRUITING NOW: OFFERING PERMANENT POSITIONS
At Ivor King, we pride ourselves on being a dynamic and progressive organisation with a quality ‘can-do’ approach to business. That’s why people are at the core of our success and we’re proud to employ some of the most talented engineers, designers and operational staff in the construction industry. We’re committed to providing a first class level of service, underpinned by our company vision to deliver on customer promises.
We're ...currently looking for sheet piling specialists of all levels; from trainee piling operatives to experienced operatives.
You might be looking to extend your knowledge and skills or perhaps you are someone with a wealth of experience to bring to our successful piling teams.
We are also interested in hearing from experienced Movax operators.
As a company, we're committed to the professional development of our employees and this is a fantastic opportunity to join our successful and expanding business.
If this sounds like you, please e-mail your CV to hr@ivorking.co.uk
More info at www.ivorking.co.uk/about/careers/
#recruiting
See More

User

Ivor King are currently working at the University of Birmingham, installing 600mm diameter CFA piles. Our Woltman THW 4019D rig is installing 180 piles up to 22m in length with up to 4m rock sockets into sandstone.
Previous to the CFA piling activity, variable site levels required us to install a total of 134 sheet piles using our ABI TM14/17 telescopic leader rig in order for the piling platform to be prepared for the CFA rig.
In addition, one area of the site was found t...o be contaminated, so we developed a driven steel tube option in order to reduce the volume of contamination and keep project costs within budget.
Utilising our multi-discipline capabilities, we have been able to design and deliver the sheet, tube and CFA piling works with one management team, providing a significant saving on the client’s construction programme.
Whatever your piling project, we’re your people.
See More

User

Our floating pontoons are ideal for survey and repair of bridges, harbour walls, locks, canal and river banks, or anywhere a safe working platform over water is required.
The pontoons are road transportable and can be assembled to create a wide variety of different platforms.
This versatile modular system can be configured to carry plant such as excavators, MEWPS and piling rigs when used in conjunction with Navi Mats.
... All of our piling equipment, including our extensive stockholding of pontoons is available for hire on a short or long-term basis. More information at ivorking.co.uk/piling-equipment
Whatever your piling project, we’re your people.
See More

User

We’re proud to announce Ivor King has moved up a gear to achieve the Fleet Operator Recognition Scheme’s (FORS) Silver Accreditation!
FORS Silver demonstrates that we are actively committed to improved safety, environmental impact and efficiency, with continual efforts to set new benchmarks of performance.
That means reassurance and customer confidence in the standards we operate to and the service we deliver.
... Managing Director, Simon King said ‘I believe FORS Silver will help set us apart as a high quality operator taking the issues of vulnerable road users seriously. It shows we’re committed to being safer, greener and more efficient; but our journey doesn’t end here – next we’re going for Gold!’
To find out more about our transport capabilities, visit ivorking.co.uk/transport
#Transport #FORS #Safety
See More

User

The Ivor King 2018 Festive Fun Day in aid of our two nominated charities; The Air Ambulance Service and Zoë’s Place Baby Hospice.
The Air Ambulance Service respond to medical emergencies, transporting patients by air in lifesaving missions fuelled purely by donations. See theairambulanceservice.org.uk
Zoë’s Place provides palliative, respite and end of life care to babies and infants aged from birth to five years suffering from life-limiting or life-threatening conditions. Mo...re at zoes-place.org.uk
Thanks to the generosity of our staff, our Festive Fun Day managed to raise a fabulous £1500, split equally between these two fantastic charities.
See More

User

When you’re installing sheet piles at the end of a residential cul-de-sac, next to an adjacent river, your installation method needs to be silent, vibration-free and environmentally friendly.
Add hard ground conditions into the mix and you’re going to need our Giken Supercrush solution.
That’s why Ivor King has invested heavily in Giken Silent Piling technology in recent years. We’re also the ONLY owners of 'Supercrush' Silent Piling equipment in the UK and the largest in Eur...ope.
Watch the video to see our Supercrush machine in action at a recent project to reinstate a flood damaged retaining wall and river footpath at Lady’s Walk in Morpeth.
Whatever your piling project, we’re your people.
See More

User

Sometimes you need to get high-up to truly appreciate the size and scale of some of the work we undertake.
Check out this fabulous 360° aerial photograph taken during the final stages of sheet pile installation at Minworth Sewage Treatment Works, on the outskirts of Birmingham.
We installed 750 steel sheet piles spanning almost half a kilometre, over 16 weeks into hard ground, using silent and vibration-free Giken Supercrush technology.
... Ivor King are the only owners of 'Supercrush' Silent Piling Technology in the UK and the largest in Europe. To find out more about our Supercrush solutions, click ivorking.co.uk/supercrush-silent-piling-s olutions/
Whatever your piling project, we’re your people.
[With thanks to AGD Equipment Ltd and OctoVision Media]
See More

User

Severn Trent’s Water Treatment Works at Frankley supplies drinking water to Birmingham and the surrounding area.
As part of the Birmingham Resilience Scheme to safeguard water supplies to the UK’s second city, a new main treatment building has been commissioned.
Ivor King recently installed a continuous sheet pile retaining wall of 91 linear metres at varied retained heights, delivered over two phases in order to facilitate construction of the new building and to provide main...tenance post-construction.
The pile line was pre-augered using our ABI TM13/16 Telescopic Leader Rig to improve drivability and reduce overall vibration and noise during installation. GU27 sheet piles at 8m in length were then driven to level into a stiff clay embankment using our RTG RG21T Leader Rig and powerful MR150 AVM hydraulic vibro hammer.
Whatever your piling project, we’re your people.
See More

User

Plâs-Uchaf Reservoir in Denbighshire provides raw water for a nearby water treatment works.
As part of an upgrade of the spillway and syphon pipes for Dwr Cymru Welsh Water, Ivor King was commissioned by Skanska Construction UK to install 10 universal columns to carry the new syphon pipes.
Working from floated pontoons, an excavator mounted Movax was used to install the columns, with a silt curtain placed around the working area to prevent migration of silt caused by the pili...ng process.
Additional anchorage points were provided using two air operated winches located on pontoons and tethered to the opposite side of the reservoir.
Following installation of the 10 columns, 3.2m steel cross beams were lowered between each pair of columns for divers to bolt in place, in readiness to support to a new syphon pipe running up the slope of the dam.
Whatever your piling project, we’re your people.
See More

User

Ivor King owns and operates its own transport fleet with a diverse capability to transport heavy or abnormal loads.
Here, our PVE 55DR Bored Piling Rig is on the move from a job in Oxford to Brentford FC, aboard our Volvo F16 pulling a Broshuis BV 2 bed 4 trailer.
Check out our transport capabilities by clicking on ivorking.co.uk/transport

User

Ivor King installing sheet piles using two of our Giken F301 Silent Pilers working concurrently on either side of a watercourse in North London.
A total of 680 metres of EZ18-700 steel sheet piles have been installed using this silent and vibration-free technique, ideal for environmentally sensitive areas.
The project has been supported by AGD Equipment Ltd’s 70T Sherpa and 25T Sherpina cranes working from a temporary modular steel crane platform designed and manufactured by ...Ivor King.
Whatever your piling project, we’re your people.
See More

User

RECRUITING NOW: LGV CLASS 1 DRIVER
We're currently on the look out for an experienced driver to join our transport team. The role is a permanent, full time position and involves nights out during the week.
Working within Ivor King's dedicated Transport department, you'll be required to drive our HGV vehicles, delivering various items of plant and equipment to our own sites, as well as to external customers. You'll also be responsible for supervising the loading of vehicles to... ensure all plant and equipment is safely loaded and adequately secured for transit, to minimise the risk of damage.
The role will require you to have regular contact with site personnel; providing exceptional customer service whilst ensuring all plant & equipment arrives at site safely.
You'll hold a full clean LGV (Class 1) licence and have a valid Driver Qualification Card (DCPC). Holding a Lorry Loader CPCS Card or similar qualification would be an advantage.
As a company, we're committed to the professional development of our employees and this is a fantastic opportunity to join our successful and expanding business.
If this sounds like you, please e-mail your CV to hr@ivorking.co.uk
More info at ivorking.co.uk/about/careers/
See More

User

Lady’s Walk is a picturesque footpath on the bank of the River Wansbeck in Northumberland, connecting Morpeth town centre with the nearby village of Mitford. During the rainy Easter weekend 2018, 35m of river retaining wall and footpath subsided and fell into the river.
Northumberland County Council engaged the services of Ivor King to install a sheet piled retaining wall in to order to stabilise the land, enabling necessary repairs to be carried out and ultimately for the pu...blic footpath to be reinstated.
Challenging ground conditions, environmental issues and extremely restricted access have made this project particularly complex; access via a 3.2m wide cul-de-sac, with neighbouring properties within close proximity and an environmentally sensitive location.
Using Giken Supercrush technology, we were able to overcome hard ground conditions, whilst pressing-in piles using silent vibration-free methodology, ideal for residential areas such as this.
Ivor King are exclusive owners of 'Supercrush' Silent Piling Technology in the UK and the largest in Europe. To find out more about our Supercrush solutions, click ivorking.co.uk/supercrush-silent-piling-s olutions/
Whatever your piling project, we’re your people.
*Aerial photograph supplied by OctoVision Media as part of a forthcoming Ivor King video.
See More

User

After 16 weeks on site and the installation of some 750 sheet piles spanning almost half a kilometre, we celebrate the final pile going in at Minworth Sewage Treatment Works, four weeks ahead of schedule.
Ivor King was asked to design a solution to retain and stabilise a lagoon embankment, whilst protecting against erosion from the adjacent River Tame.
Due to the risk of landslip coupled with adverse ground conditions, we deployed Giken ‘Supercrush’ technology. This ensured w...e could overcome hard ground conditions whilst using a silent and vibrationless, environmentally sensitive method of installation.
Ivor King are exclusive owners of 'Supercrush' Silent Piling Technology in the UK and the largest in Europe. To find out more about our Supercrush solutions, click ivorking.co.uk/supercrush-silent-piling-s olutions/
Whatever your piling project, we’re your people.
See More

User

Ivor King working on a Flood Alleviation Scheme in East Yorkshire, installing a cut-off wall to reduce the risk of flooding in the historic market town of Pocklington.
Comprising 274 pairs of ZZ19-700 steel sheet piles at 5 and 6m lengths, piles are being driven to level without the need for pre-augering or back driving using our state-of-the-art RTG RG21T Leader Rig and MR150AVN vibro and twin clamp.
Once complete, a flood storage area will be commissioned to regulate the fl...ow of flood water, helping to protect local residents, businesses and infrastructure from future flooding events.
Whatever your piling project, we’re your people.
See More

User

A recent scheme to replace Telford Central footbridge saw Ivor King install a combination of steel bearing piles at 16.5m into hard clay strata, along with 750mm diameter CFA piles to a depth of 22.5m.
The bridge, which connects the station with the town centre, spans a railway line and dual carriageway.
The project was subject to strict vibration limits and adhered to LEAN construction methods, ensuring all pile and plant deliveries were aligned to a pre-defined programme of... work, using our in-house transport facilities.
Our ability to offer a multi-disciplined solution meant improved programme efficiency and value for the client.
See the Case Study here: ivorking.co.uk/case-studies/telford-centr al-footbridge/
Whatever your piling project, we’re your people.
See More

User

At Ivor King we believe piling's not just about plant, but the people that make it happen.
That's why we're proud of our fantastic working relationship with AGD Equipment Ltd.
Both family run businesses, our association goes back decades and it's reassuring to know you have a team you can trust when partnering on a project.
... Our latest project sees us working closely on an embankment stabilisation scheme at New River, London.
Whatever your piling project, we're your people.
See More

More about Ivor King Piling

Ivor King Piling is located at Haunchwood Park Industrial Estate, CV10 9PD Nuneaton, Warwickshire
024 7639 7272
Monday: 08:30 - 17:00
Tuesday: 08:30 - 17:00
Wednesday: 08:30 - 17:00
Thursday: 08:30 - 17:00
Friday: 08:30 - 17:00
Saturday: -
Sunday: -
https://www.ivorking.co.uk