King Edward Vii Bridge

About King Edward Vii Bridge

The King Edward VII Bridge is a railway bridge spanning the River Tyne between Newcastle upon Tyne and Gateshead, in North East England. It is a Grade II listed structure. The bridge was designed and engineered by Charles A. Harrison, the Chief Civil Engineer of the North Eastern Railway, and built by the Cleveland Bridge & Engineering Company in Darlington. The bridge consists of four lattice steel spans resting on concrete piers. The total length of the bridge is and 112ft above high water mark. Originally trains used the High Level Bridge to reach Newcastle Central Station and had to leave the station in the same direction they entered, which involved the tedious task of reversing. The construction of the King Edward VII Bridge provided four more rail tracks and a direct line through the station, enabling trains to enter or leave from either side, thus easing rail congestion. The bridge was opened by King Edward VII and Queen Alexandra on 10 July 1906 despite being still unfinished at this time. General traffic began using the bridge on 1 October 1906. The total cost was over £500, 000.

King Edward Vii Bridge Description

The King Edward VII Bridge is a railway bridge spanning the River Tyne between Newcastle upon Tyne and Gateshead, in North East England. It is a Grade II listed structure. The bridge was designed and engineered by Charles A. Harrison, the Chief Civil Engineer of the North Eastern Railway, and built by the Cleveland Bridge & Engineering Company in Darlington. The bridge consists of four lattice steel spans resting on concrete piers. The total length of the bridge is and 112ft above high water mark. Originally trains used the High Level Bridge to reach Newcastle Central Station and had to leave the station in the same direction they entered, which involved the tedious task of reversing. The construction of the King Edward VII Bridge provided four more rail tracks and a direct line through the station, enabling trains to enter or leave from either side, thus easing rail congestion. The bridge was opened by King Edward VII and Queen Alexandra on 10 July 1906 despite being still unfinished at this time. General traffic began using the bridge on 1 October 1906. The total cost was over £500, 000.

More about King Edward Vii Bridge

King Edward Vii Bridge is located at Newcastle upon Tyne
+442089024537
http://www.ranker.com/review/king-edward-vii-bridge/1378055