About Caldicot Railway Station
Caldicot railway station is a part of the British railway system owned by Network Rail and is operated by Arriva Trains Wales. Caldicot is a small town in Monmouthshire, south Wales. It is located between Chepstow and the city of Newport on the Gloucester line; the line to Bristol via the Severn Tunnel runs just to the north but there are no platforms here; however, Severn Tunnel Junction station is within walking distance for those wanting to travel to Bristol. HistoryThe railway line through Caldicot was built as the broad gauge South Wales Railway in 1850, although the nearest station was at Portskewett, two miles to the east. In 1861 a private siding was opened to serve the Caldicot Iron & Wire Works, from 1880 the Severn Tinplate Works, on what is now the industrial estate on the Sudbrook road, south of the castle. In typical broad gauge fashion, these works lines used two short hand-worked turntables to move wagons between the lines, rather than points. In 1872, the South Wales Railway was re-gauged from broad gauge to standard gauge. By 1875 the wire works was also served by a level crossing and a crossover between the two running lines, controlled by a signal box. It is likely that this relaying was carried out earlier, as part of the re-gauging work.
Caldicot Railway Station Description
Caldicot railway station is a part of the British railway system owned by Network Rail and is operated by Arriva Trains Wales. Caldicot is a small town in Monmouthshire, south Wales. It is located between Chepstow and the city of Newport on the Gloucester line; the line to Bristol via the Severn Tunnel runs just to the north but there are no platforms here; however, Severn Tunnel Junction station is within walking distance for those wanting to travel to Bristol. HistoryThe railway line through Caldicot was built as the broad gauge South Wales Railway in 1850, although the nearest station was at Portskewett, two miles to the east. In 1861 a private siding was opened to serve the Caldicot Iron & Wire Works, from 1880 the Severn Tinplate Works, on what is now the industrial estate on the Sudbrook road, south of the castle. In typical broad gauge fashion, these works lines used two short hand-worked turntables to move wagons between the lines, rather than points. In 1872, the South Wales Railway was re-gauged from broad gauge to standard gauge. By 1875 the wire works was also served by a level crossing and a crossover between the two running lines, controlled by a signal box. It is likely that this relaying was carried out earlier, as part of the re-gauging work.