Trawsfynydd Power Station

About Trawsfynydd Power Station

Trawsfynydd nuclear power station is a former Magnox power station situated in Snowdonia National Park in Gwynedd, Wales. The plant, which became operational in 1965, was the only nuclear power station in the UK to be not built on the coast (cooling water was taken from the man-made reservoir, Llyn Trawsfynydd). It was closed in 1991. Work to completely decommission the site is expected to take almost 100 years. HistoryThe power station, which takes its name from the nearby village of Trawsfynydd, was designed by Basil Spence. The construction, which was undertaken by a consortium involving Crompton Parkinson, International Combustion, Fairey Engineering and Richardsons Westgarth, and known as the Atomic Power Constructions (APC), began in July 1959, and both of the reactors were in operation by March 1965, with the station opening fully in October 1968, at a cost of £103 million. It had two Magnox reactors producing 470 megawatts (MW) in total. The reactors were supplied by APC and the turbines by Richardsons Westgarth. The civil engineering work was undertaken by Holland, Hannen & Cubitts and Trollope & Colls. The architectural consultant for the buildings was Sir Basil Spence and the landscape architect was Sylvia Crowe.

Trawsfynydd Power Station Description

Trawsfynydd nuclear power station is a former Magnox power station situated in Snowdonia National Park in Gwynedd, Wales. The plant, which became operational in 1965, was the only nuclear power station in the UK to be not built on the coast (cooling water was taken from the man-made reservoir, Llyn Trawsfynydd). It was closed in 1991. Work to completely decommission the site is expected to take almost 100 years. HistoryThe power station, which takes its name from the nearby village of Trawsfynydd, was designed by Basil Spence. The construction, which was undertaken by a consortium involving Crompton Parkinson, International Combustion, Fairey Engineering and Richardsons Westgarth, and known as the Atomic Power Constructions (APC), began in July 1959, and both of the reactors were in operation by March 1965, with the station opening fully in October 1968, at a cost of £103 million. It had two Magnox reactors producing 470 megawatts (MW) in total. The reactors were supplied by APC and the turbines by Richardsons Westgarth. The civil engineering work was undertaken by Holland, Hannen & Cubitts and Trollope & Colls. The architectural consultant for the buildings was Sir Basil Spence and the landscape architect was Sylvia Crowe.

More about Trawsfynydd Power Station

Trawsfynydd Power Station is located at Blaenau-Ffestiniog, Gwynedd, United Kingdom