Slinky Interiors Ltd

About Slinky Interiors Ltd

Strategic Furniture procurement, office furniture, design and project management

Reviews

User

Onsite completing 80 fully electronic height adjustable workstations with inter grated power and monitor arms. Meeting booths and meeting room. Love my job ๐Ÿ˜

User

Offload 170 canteen chairs for the College of Policing ๐Ÿ‘ฎ๐Ÿปโ€โ™€๏ธ. A very wet morning at this amazing facility.

User

Installation this morning in Leamington Spa. Beautiful Lano table by Orangebox and Caulder conference chair in fabric and leather mix. Cutch and AVI sofa and arm chairs to the reception and breakout room. #lovemyjob

User

On site this morning at the start of the next project. Bit of a Blank canvass. I really like this stage of a project and then being able to see it through to the final Instalation and seeing the total transformation

User

Last few breakout items installed. Ready to go for the staff move in on Monday ๐Ÿ˜Ž

User

This Site is coming together. Chemistry electronic height adjustable workstations with Humanscale Monitor arms and desk top USB charging capsules. Thatโ€™s the open plan done, offices, meeting rooms and staff breakout to go. 24hrs to go until completions ๐Ÿ’ช๐Ÿป

User

90 height adjustable workstations being installed. 48hrs to go until completion. Pressure is on and the team are on it.

User

Site survey this morning. All ready and good to go. Looking forward to Monday mornings delivery ๐Ÿ’ฅ๐Ÿ’ช๐Ÿป

User

Holborn London. Just Completed this installation. Fully height adjustable workstations with Desk top power. Orangebox Cubb Bar stool and Allermuir Silta high tables with integrated usb charging. Folding boardroom table and Fifty Series reception chairs. ๐Ÿ‘

User

Reception Sofas installed today. FROVI high backs. ๐Ÿ˜

User

Holborn London. New London Office installation of presentation rooms, height adjustable workstations, collaborative breakout spaces and formal reception seating.
This project is moving towards its completion and is looking amazing.
... Senator Chemistry Height adjustable Workstations Orangebox Task Chairs, Convo meeting tables with integrated power. Allermuir break and reception seating. ๐Ÿ˜Ž
See more

User

Itโ€™s days like these that I Just LOVE my job, Just had the privilege of a tour round the International Olympic Committeeโ€™s brand new offices in Lausanne Switzerland. Massive thank you to Rachel Spry โœŠ๐Ÿป. The best tour guide ever ๐Ÿ˜˜. Absolutely loved the gym facilities and the massive restaurant and sun deck area. But the masterful center staircase is mesmerising. Something that needs to be seen as no description will do it justice. Modern working practices deployed with aplomb... and panache. The interior design is magnificent and so sophisticated. It Oozes class in every detail. Maybe the bottomless pit budget has helped, but even if you have all the money in the world. Money doesnโ€™t buy you class but here In this building it has absolute paid for and delivered class. Most of us will never have the pleasure to work in an environment like the one delivered here. If the Olympics is about the very highest level of excellence in sport. Then this working environment is a credit to the IOC and what it stands for. And yes..... I am impressed ๐Ÿ˜Ž. I love the history of the Olympics that has been captured here, the very essence of the modern Olympics and its roots are everywhere to be seen. I am a fan of the Olympics and watch every minute I can every 4 years, So today I have ticked off my bucket list number 46. Done โœ… ๐Ÿคฉ
See more

User

Fisher German Worcester Move Into their new offices and the crates keep arriving. This has been a testing project where existing storage wall has been broken down. Adapted and relocated from one office to their new location 5 miles away. Existing desks have also been moved, stored and Re Installed to the new layout. The many files also tracked from site A to Site B. This has been a testing operation where failure wasnโ€™t an option. UBI supplies the manpower to support Slinky in this projects to its completion.

User

Exciting times on site this afternoon at Fisher German. The strip out has begun. I really love this phase of the project. โ€œOut with the old, in with the newโ€ endless possibilities ๐Ÿ˜Ž

User

Phase 2 this week in Gloucester. On site building Height adjustable desks, sit stand Monitor arms and high back sofas. Phase 3 is next ๐Ÿ’ช๐Ÿป

User

Central Birmingham for this next installation. Ousby task chairs, Chemistry Desk, Ad-lib tables and Trillips Meeting chairs. No lift access always a favourite with the installation team ๐Ÿ˜‚

User

West Bromwich Installation complete on time. One missing castor and a damaged top to report. 70 workstations with desk top power usb charging, meeting room tables and chairs, high breakout table with integrated power and stylish bar stools. This project has been a pleasure to work on ๐Ÿ˜Ž

User

Day 2 on site. This installation is moving on at a pace nearing completion.

More about Slinky Interiors Ltd

Slinky Interiors Ltd is located at Boreley Lane, Wr90hw Ombersley, Worcestershire
07966876735
http://slinkyinteriors.co.uk